BORO Publications

NORSOK SCCS:

An improving ‘structural constraints’ case study

22 September 2013Tutorial - ONTOBRAS 2013, Brazilian Conference on Ontologies, 23-25 September 2013, Belo Horizonte, Brazil

Abstract

This tutorial provides an illustrative example of how the BORO methodology has been used to re-engineer and improve ‘structural constraints’ in existing frameworks. It provides a nice example of how an ontological analysis can reveal the constraints and identify how they can be improved. The case study is taken from a project that developed a common data foundation for an oil and gas enterprise. One area under analysis was cost management. The starting point for the analysis was the NORSOK Z-014 Standard cost coding system. The tutorial looks at its the structural constraints were identified and remedied. This is part of a series of tutorials that walk through examples that illustrate how the BORO methodology has been used to re-engineer data in an industrial context.

Paper Notes

This tutorial provides an illustrative example of how the BORO methodology has been used to re-engineer and improve ‘structural constraints’ in existing frameworks. It provides a nice example of how an ontological analysis can reveal the constraints and identify how they can be improved. The case study is taken from a project that developed a common data foundation for an oil and gas enterprise. One area under analysis was cost management. The starting point for the analysis was the NORSOK Z-014 Standard cost coding system. The tutorial looks at its the structural constraints were identified and remedied. This is part of a series of tutorials that walk through examples that illustrate how the BORO methodology has been used to re-engineer data in an industrial context.

Downloads

  • Presentation Fileapplication/vnd.openxmlformats-officedocument.presentationml.slideshow

Tags

  • tullowoil
  • boroexample